Haslin Constructions

Projects

Eurobodalla Southern Storage Dam

Sector Water
Year 2022-25
Location Eurobodalla, NSW
Client Eurobodalla Council
Value $140m

The Eurobodalla Southern Water Supply Storage Dam is a generation-defining infrastructure project entailing delivery of a 3000 Megalitre Off-River Storage Dam adjacent to the mighty Tuross River that guarantees water security in the Eurobodalla Shire Council. The dam second facility of this magnitude that Haslin have delivered, after the 2015 delivery of the scope-similar $36 Million Bowraville Off-River Storage Dam.

With over 90% of the workforce coming from the local community, the Haslin team delivered this project collaboratively and innovatively, with over 1 Million cubic metres of earthworks safely undertaken. Haslin also undertook significant excavation, with over 550,000 cubic metres of hard rock won from on-site quarries, helping to deliver features such as the dam’s centrepiece – the 370m long, 39m high clay-core embankment.

Another highlight of the project was the Haslin’s participation in the Heading 4 The Future program (video), a collaboration between Haslin, UTS and AIESEC that saw 20 engineering students undertake a two-week internship involving a site visit and Haslin team workshops, with five of the participants awarded internships.

Eurobodalla Dam, Scope of Work:

  • capacity to hold up to 3,000ML of water
  • a 370m long embankment, 39m in height and a crest width of 20m, located on an unnamed tributary of the Tuross River
  • a spillway to allow the dam to release water from heavy rainfall events into the Tuross River
  • permanent erosion control structures located downstream of the spillway
  • an inlet to convey and dissipate raw water transferred from the river intake pump station through a pipeline
  • an outlet to allow transfer of water from the storage to the existing water treatment plant (WTP)
  • instruments to monitor seepage, reservoir levels and water quality
  • a thermal stratification control system
  • a boat ramp at the water storage facility for maintenance and access for water quality monitoring
  • safety and perimeter fencing at the water storage facility.

Scope of Work (Ancillary Facilities):

  • a new pump station with capacity to extract up to 26ML from the river and up to 6ML from the borefield
  • water transfer infrastructure with:
    • a pipeline with a capacity of 26ML per day to transfer raw water from the new river intake pump station to the storage inlet chute
    • a pipeline connection from the borefield to the river intake pump station
    • a storage access road roughly 1km long from Eurobodalla Road opposite the WTP to the site
    • a 70m long access road for vehicles to access the river intake pump station
    • power supply including new sub-stations near the storage and pump station.