Haslin Constructions

Projects

Tea Gardens Water Treatment Plant

Sector Water + Wastewater
Year Completed 2012
Location NSW Mid-North Coast
Client Midcoast Water
Value $8.5m

This project involved the construction, testing and commissioning of new water treatment plant, capable of producing 24ML of treated, raw water per day. The plant includes two raw water storage tanks, an MBR filtration plant, chemical dosing system, electrical works, highlift pump station, treated water storage tank, as well as the requisite pipeworks and roadworks. The Project further included construction of industrial buildings such as a pre-treatment building, MBR treatment building, control room and maintenance facilities.