Sector Water + Wastewater
Year 2024-25
Location Bowral, NSW
Client Wingecarribee Shire Council
Value $55M
This project entails a major upgrade to Bowral’s Wastewater Treatment Plant infrastructure that will ensure its utility for the next generation. The scope of work currently being carried out by Haslin includes:
- Inlet works with two mechanical band screens for fine screening and grit removal;
- Contingency for emergency storm or flooding conditions, in the form of a manual screened bypass to the existing storm detention pond, which later returns stored water to the treatment process;
- A new lift pump station to transfer influent to the bioreactors;
- Odour control measures
- Two new bioreactors and two secondary clarifiers;
- Tertiary filters consisting of four dual media filter cells and a new UV system;
- An aerobic digester;
- A new mechanical dewatering and sludge handling facility;
- Conversion of the existing catch/balance tank to an emergency storage tank;
- Upgraded reclaimed effluent system for onsite use.