Haslin Constructions

Projects

Bowral Wastewater Treatment Plant

Sector Water + Wastewater
Year 2024-25
Location Bowral, NSW
Client Wingecarribee Shire Council
Value $55M

This project entails a major upgrade to Bowral’s Wastewater Treatment Plant infrastructure that will ensure its utility for the next generation. The scope of work currently being carried out by Haslin includes:

  • Inlet works with two mechanical band screens for fine screening and grit removal;
  • Contingency for emergency storm or flooding conditions, in the form of a manual screened bypass to the existing storm detention pond, which later returns stored water to the treatment process;
  • A new lift pump station to transfer influent to the bioreactors;
  • Odour control measures
  • Two new bioreactors and two secondary clarifiers;
  • Tertiary filters consisting of four dual media filter cells and a new UV system;
  • An aerobic digester;
  • A new mechanical dewatering and sludge handling facility;
  • Conversion of the existing catch/balance tank to an emergency storage tank;
  • Upgraded reclaimed effluent system for onsite use.